US 8,448,181 B2#30126836 Most CitedActiveUnited States (USPTO)Utility

Sizing an infrastructure configuration optimized for a workload mix

3Forward Citations (#30126836 Global)
0.2/yrCitation Velocity (#30899884 Global)
1.24Citation PageRank (#30446050 Global)
21Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Sizing an infrastructure configuration optimized for a workload mix includes: a) instructing a virtualized-aware testing service (VATS) test controller to perform a test of an initial infrastructure configuration in a virtualized environment, in which the test provides at least one test result; b) determining whether the at least one test result satisfies a predetermined requirement as identified in the workload mix; c) modifying at least one parameter of the initial infrastructure configuration to create a modified infrastructure configuration in response to the at least one test result failing to satisfy the predetermined requirement; d) instructing the VATS test controller to perform another test on the modified infrastructure configuration to generate another at least one test result; e) repeating steps b)-d) until a final infrastructure configuration that causes the another at least one test result to satisfy the predetermined requirement is identified; and f) outputting the final infrastructure configuration.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method for sizing an infrastructure configuration optimized for a workload mix, said method comprising: a) instructing a virtualized-aware testing service (VATS) test controller to perform a test of an initial infrastructure configuration in a virtualized environment, wherein the test generates at least one test result; b) determining whether the at least one test result satisfies a predetermined requirement as identified in the workload mix; c) modifying at least one of a plurality of parameters of the initial infrastructure configuration to create a modified infrastruc

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (21)

PatentTitleYearCitations
US 5,303,166 AMethod and system for automated network benchmark performance analysis1994138
US 2003018513 A1System, method and computer program product for benchmarking in a supply chain management framework—173
US 2003069779 A1System, mehod and computer program product for a supply chain management framework—10
US 6,601,020 B1System load testing coordination over a network2003178
US 2004103017 A1Adaptive marketing using insight driven customer interaction—146
US 2004102980 A1Standardized customer application and record for inputting customer data into analytic models—32
US 2005154628 A1Automated management of business performance information—169
US 2006136579 A1Method of executing test scripts against multiple systems—28
US 2006161884 A1Methods for managing capacity—156
US 2006184414 A1Business management tool—54
US 2006265470 A1System and method for determining a partition of a consumer's resource access demands between a plurality of different classes of service—44
US 2007112615 A1Method and system for boosting the average revenue per user of products or services—53
WO 2007/065195 A1Real-time automated benchmarking system—12
US 2007219944 A1Apparatus, system, and method for modeling, projecting, and optimizing an enterprise application system—33
US 2008022285 A1System and method for evaluating a workload and its impact on performance of a workload manager—40
US 2008082977 A1Automatic load and balancing for virtual machines to meet resource requirements—175
US 2008263400 A1Fault insertion system—26
US 2009300423 A1Systems and methods for software test management in cloud-based network—177
US 2010050172 A1Methods and systems for optimizing resource usage for cloud-based networks—345
US 2010088150 A1Cloud computing lifecycle management for n-tier applications—230
US 7,769,735 B2System, service, and method for characterizing a business intelligence workload for sizing a new database system hardware configuration201012

Non-Patent Literature (5)

  • Andreica, et al., "Towards ServMark and Architecture for Testing Grids", Nov. 2006; CoreGRID, pp. 1-12.
  • Catalin Dumitrescu et al.,"DiPerF: an automated Distributed PERformance testing Framework", In Proc. 5st IEEE/ACM Internal Workshop on Grid Computing, 2004.
  • Diwakar Krishnamurthy et al., "A Synthetic Workload Generation Technique for Stress Testing Session-Based Sys.", Int'l Conference on Software Eng'g Advances(ICSEA 2007).
  • Final Office Action dated Jun. 13, 2012, U.S. Appl. No. 12/363,558, filed Jan. 30, 2009.
  • Jerry Rolia et al., "Adaptive Information Technology for Service Lifecycle Management", HP Laboratories, HPL-2008-80, Jul. 21, 2008.