Patents
US 8,448,178 B2#22348323 Most CitedActiveUnited States (USPTO)Utility

Prediction based priority scheduling

5Forward Citations (#22348323 Global)
0.4/yrCitation Velocity (#21398929 Global)
1.17Citation PageRank (#33590841 Global)
13Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Systems and methods are provided that schedule task requests within a computing system based upon the history of task requests. The history of task requests can be represented by a historical log that monitors the receipt of high priority task request submissions over time. This historical log in combination with other user defined scheduling rules is used to schedule the task requests. Task requests in the computer system are maintained in a list that can be divided into a hierarchy of queues differentiated by the level of priority associated with the task requests contained within that queue. The user-defined scheduling rules give scheduling priority to the higher priority task requests, and the historical log is used to predict subsequent submissions of high priority task requests so that lower priority task requests that would interfere with the higher priority task requests will be delayed or will not be scheduled for processing.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 5.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for scheduling task requests, the method comprising: maintaining a historical log comprising a plurality of discrete, sequential time periods, each time period representing a substantially equivalent pre-determined length of time; identifying high priority time periods within the historical log during which at least one high priority task request was received; identify low priority time periods within the historical log, in which no high priority task request was received; identifying for each low priority time period a number of high priority time periods immediately preceding that l

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Jiong Luo and Niraj K. Jha; Power-conscious Joint Scheduling of Periodic Task Graphs and Aperiodic Tasks in Distributed Real-time Embedded Systems; ACM 2000; pp. 357-364.
  • Search report from corresponding Chinese patent application No. 200810881343.