System and method for service parts planning
Abstract
Embodiments of the invention are generally directed to a system and method for service parts planning in a network having one or more service parts. For at least a subset of the one or more service parts, a calculation is performed to determine a location within the network at which allocating the service part provides the greatest gain in system availability per item cost. In an embodiment, the calculations are based, at least in part on machine-specific information. In one embodiment, inventory position is determined based, at least in part, on a unique identifier associated with a service part.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for service parts planning in a network having one or more service parts comprising: (a) for each of at least a subset of the one or more service parts, calculating, for the service part, system availability per cost of the service part for each of a plurality of locations within the network, the system availability is a probability that the service part is functioning, wherein the calculating is based, at least in part, on machine-specific information that includes at least one of machine-specific usage information, and machine-specific early indicator of failure information; (b) det
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (2)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 7,210,624 B1 | Redistribution of parts in a distribution network | 2007 | 50 |
| US 7,337,031 B1 | Optimized deployment of parts in a distribution network | 2008 | 12 |
Non-Patent Literature (5)
- Al-Bahi, Spare Provisioning Policy Based on Maximization of Availability per Cost Ratio, Computers Ind. Engng vol. 24, No. 1, 1993, p. 81-90.
- Cohen et al., Optimizer: IBM's Multi-Echelon Inventory System for Managing Service Logistics, Interfaces 20: Jan. 1-Feb. 1990, p. 65-82.
- Hausman and Scudder, Priority Scheduling Rules for Repairable Inventory Systems, Management Science, vol. 28, No. 11 (Nov. 1982), pp. 1215-1232.
- Pyke, Priority Repair and Dispatch Policies for Reparable-Item Logistics Systems, Naval Research Logistics, vol. 37, 1990, p. 1-30.
- Scudder and Hausman, Spares Stocking Policies for Repairable Items with Dependent Repair Times, Naval Research Logistics Quarterly, vol. 29, No. 2, Jun. 1982, p. 303-22.