Patents
US 8,401,795 B2#13847158 Most CitedActiveUnited States (USPTO)Utility

Methods of detecting, preventing, and remediating lost circulation

8Forward Citations (#13847158 Global)
0.6/yrCitation Velocity (#12865963 Global)
1.54Citation PageRank (#21906664 Global)
7Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method for planning a wellbore, the method including defining drilling data for drilling a segment of a planned wellbore and identifying a risk zone in the segment. Additionally, the method including determining an expected fluid loss for the risk zone and selecting a solution to reduce fluid loss in the risk zone. Furthermore, a method for treating drilling fluid loss at a drilling location, the method including calculating a drilling fluid loss rate at the drilling location, classifying the drilling fluid loss based on the drilling fluid loss rate, and selecting a solution based at least in part on the classifying.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 8.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: defining drilling data for drilling a segment of a planned wellbore; identifying a risk zone in the segment; determining an expected fluid loss volume for the risk zone; and selecting a solution to reduce fluid loss in the risk zone; and drilling the planned wellbore with a drill bit using the selected solution.

  2. Claim 2Depends on #1

    The method of claim 1 , further comprising: adjusting a drilling plan to include the solution.

  3. Claim 3Depends on #1

    The method of claim 1 , further comprising: creating a drilling plan comprising the solution.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (4)

  • "Optimizing the Selection of Bridging Particles for Reservoir Drilling Fluids", Dick, et al., SPE 58793, Feb. 2000, (pp. 1-8).
  • Adachi et al., Depleted Zone Drilling: Reducing Mud Losses Into Fractures, 2004, IADC/SPE 87224, 11 pp.
  • Whitfill et al., Manage WPC to Maximize Reservoir Deliverability, Jul./Aug. 2005, Drilling Contractor, pp. 59 & 61.
  • Whitfill et al., New Design Models and Materials Provide Engineered Solutions to Lost Circulation, 2006, SPE 101693, pp. 1-14.