Smart building systems and methods
Abstract
An appliance includes a memory storage location storing a flag indicative of a predicted demand-response (DR) period such as from a utility or when a current alternating current (AC) duty cycle differs from a specified AC duty cycle by a predetermined variance; and a controller coupled to the flag to autonomously place the appliance in an energy shedding mode during the predicted DR period.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A method to fabricate a building structure, comprising: a. mixing a texture aggregate filler mixed with a phase change material (PCM), said filler being selected from the group consisting of perlite, glass microballoons, glass bubbles, phenolic microballoons, and phenolic microspheres; b. placing the PCM with the filler on a surface of the building structure exposed to a conditioned air flow and shaped to increase thermal contact between the PCM and the conditioned air flow; and c. placing elongated, open-ended, hollow PCM structures onto the surface, wherein the elongated, open-ended, hollow
- Claim 2Independent Claim
The method of c
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗