Patents
US 8,359,284 B2#27336324 Most CitedActiveUnited States (USPTO)Utility

Organization-segment-based risk analysis model

4Forward Citations (#27336324 Global)
0.3/yrCitation Velocity (#25382949 Global)
1.03Citation PageRank (#39862512 Global)
17Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

Apparatus and methods for reducing infrastructure failure rates. The apparatus and methods may compile and store data related to the organizational segments associated with the approval and implementation of an infrastructure change. Variables may be derived from the data using a range of methods, and multiple variable values may be consolidated. A model may be developed based on the values and relationships of the derived variables. The model may be applied to assess the risk involved in a prospective infrastructure change.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 4.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    Apparatus for reducing infrastructure failure rates, the apparatus comprising: first machine memory storing a first entity segment identifier; second machine memory storing a second entity segment identifier; third machine memory storing an infrastructure change identifier that identifies an historic infrastructure change; and fourth machine memory storing a failure characteristic corresponding to the historic infrastructure change; wherein the first, second, third, and fourth machine memories are addressable as different components of a same data object; an input module that is configured to

  2. Claim 2Depends on #1

    The apparatus of claim 1 wherein: the first entity segment identif

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (17)

PatentTitleYearCitations
US 2002188582 A1Automated analyzers for estimation systems—43
US 6,536,037 B1Identification of redundancies and omissions among components of a web based architecture2003640
US 2003115511 A1Method, apparatus and program for diagnosing system risk—43
US 2004107125 A1Business alliance identification in a web architecture—690
US 2005114829 A1Facilitating the process of designing and developing a project—655
US 2006058980 A1Electronic maintenance record file system for equipment such as a elevators—9
US 2007073724 A1System and method for automatic or semi-automatic software integration—8
US 7,225,250 B1Method and system for predictive enterprise resource management200770
US 2007168734 A1Apparatus, system, and method for persistent testing with progressive environment sterilzation—41
US 2007203719 A1System and method for downloading user interface components to wireless devices—34
US 7,325,055 B2Method and system for judging reliability of resources, and program for the same20086
US 2008140658 A1Method And System For Identifying Objects Of Service—4
US 2008195407 A1Operational risk control apparatus and method for data processing—8
US 2009125891 A1Method and system for monitoring code change impact on software performance—54
US 7,539,907 B1Method and apparatus for determining a predicted failure rate200998
US 7,684,792 B2Safe application distribution and execution in a wireless environment201017
US 2011067005 A1System and method to determine defect risks in software solutions—97

Non-Patent Literature (4)

  • Henson, Short-term Associative Memories, Master's Thesis, MSc IT:IKBS Project Report, Department of Artificial Intelligence, University of Edinburgh, Sep. 1993, pp. 1-150.
  • International Search Report for International Application PCT/US11/34437, Jun. 21, 2011.
  • International Search Report for International Application PCT/US11/34442, Jun. 29, 2011.
  • International Search Report for International Application PCT/US11/34450, Jul. 3, 2011.