Patents
US 8,347,983 B2#1966180 Most CitedActiveUnited States (USPTO)Utility

Drilling with a high pressure rotating control device

33Forward Citations (#1966180 Global)
2.5/yrCitation Velocity (#1271438 Global)
3.73Citation PageRank (#5332591 Global)
50Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A Drill-To-The-Limit (DTTL) drilling method variant to Managed Pressured Drilling (MPD) applies constant surface backpressure, whether the mud is circulating (choke valve open) or not (choke valve closed). Because of the constant application of surface backpressure, the DTTL method can use lighter mud weight that still has the cutting carrying ability to keep the borehole clean. The DTTL method identifies the weakest component of the pressure containment system, such as the fracture pressure of the formation or the casing shoe leak off test (LOT). With a higher pressure rated RCD, such as 5,000 psi (34,474 kPa) dynamic or working pressure and 10,000 psi (68,948 kPa) static pressure, the limitation will generally be the facture pressure of the formation or the LOT. In the DTTL method, since surface backpressure is constantly applied, the pore pressure limitation of the conventional drilling window can be disregarded in developing the fluid and drilling programs.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 33.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    Method for drilling a wellbore in a formation with a fluid, comprising the steps of: casing a portion of the wellbore using a casing having a casing shoe; determining a casing shoe pressure; determining a formation fracture pressure in the formation; positioning a rotating control device with said casing; and drilling the wellbore at a fluid pressure calculated using the lesser of the casing shoe pressure or the formation fracture pressure.

  2. Claim 2Depends on #1

    The method of claim 1 , further comprising the step of: drilling the wellbore without using a formation pore pressure to calculate said wellbore fluid pressure.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein the step of determining a casing shoe pressure comprises the step of: conducting a pressure test of the formation below the casing shoe.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗