Multi-position valves for fracturing and sand control and associated completion methods
Abstract
A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 8.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A completion method, comprising: delivering a housing having at least one valved port to a desired location downhole; performing a downhole operation through said valved port when said valved port is open; inserting at least one open ended tubular screen into said housing after performing said downhole operation, said open ended screen allowing tools to pass therethrough; sealingly supporting said screen to said housing while said screen covers said valved port; and taking fluids into said housing through said screen.
- Claim 2Depends on #1
The method of claim 1 , comprising: performing a gravel pack and formation fracture as said downhole operation.
- Claim 3Depends on #2
The method of claim 2 , comprising: providing interacting components on said housing and said screen that engage for placement of said screen over said valved port.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (22)
Non-Patent Literature (4)
- Durst, Doug G., et al., "Improved Single-Trip Multistage Completion Systems for Unconventional Gas Formations", SPE 115260, Jun. 1-14, 2008.
- Garfield, G., "New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting Fom Conventional Perforating and Gravel-Packing Operations", SPE 96660, Oct. 1-5, 2005.
- Lorenz, M., et al., "Advancement in Completion Technologies Proves Successful in Deepwater Frac-Pack and Horizontal Gravel-Pack Completions", SPE 103103, Sep. 1-22, 2006.
- Watson, Don R., et al., "One-Trip Multistage Completion Technology for Unconventional Gas Formations", SPE 114973, Jun. 1-14, 2008.