Patents
US 8,342,245 B2#14009527 Most CitedActiveUnited States (USPTO)Utility

Multi-position valves for fracturing and sand control and associated completion methods

8Forward Citations (#14009527 Global)
0.6/yrCitation Velocity (#12874726 Global)
1.34Citation PageRank (#27328757 Global)
22Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 8.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A completion method, comprising: delivering a housing having at least one valved port to a desired location downhole; performing a downhole operation through said valved port when said valved port is open; inserting at least one open ended tubular screen into said housing after performing said downhole operation, said open ended screen allowing tools to pass therethrough; sealingly supporting said screen to said housing while said screen covers said valved port; and taking fluids into said housing through said screen.

  2. Claim 2Depends on #1

    The method of claim 1 , comprising: performing a gravel pack and formation fracture as said downhole operation.

  3. Claim 3Depends on #2

    The method of claim 2 , comprising: providing interacting components on said housing and said screen that engage for placement of said screen over said valved port.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (22)

PatentTitleYearCitations
US 4,969,524 AWell completion assembly199049
US 5,413,176 ASand screen repair199514
US 5,875,852 AApparatus and associated methods of producing a subterranean well1999106
US 5,971,070 AApparatus for completing a subterranean well and associated methods199917
US 6,176,307 B1Tubing-conveyed gravel packing tool and method200150
US 2003230406 A1Single placement well completion system—42
US 6,978,840 B2Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production200556
US 7,013,979 B2Self-conforming screen200676
US 2006124310 A1System for Completing Multiple Well Intervals—365
US 7,066,265 B2System and method of production enhancement and completion of a well200678
US 7,185,703 B2Downhole completion system and method for completing a well200717
US 7,316,274 B2One trip perforating, cementing, and sand management apparatus and method200830
US 7,401,648 B2One trip well apparatus with sand control200827
US 7,461,699 B2Method for providing a temporary barrier in a flow pathway200829
US 2009044944 A1Multi-Position Valve for Fracturing and Sand Control and Associated Completion Methods—153
US 2009078408 A1Apparatus for Providing a Temporary Degradable Barrier in a Flow Pathway—19
US 2009084553 A1Sliding sleeve valve assembly with sand screen—171
US 7,520,335 B2Cased hole perforating alternative200913
US 2009101355 A1Water Sensing Adaptable In-Flow Control Device and Method of Use—20
US 7,575,062 B2Methods and devices for treating multiple-interval well bores200943
US 2009223678 A1Heat Generator For Screen Deployment—19
US 2009255686 A1Method for providing a temporary barrier in a flow pathway—53

Non-Patent Literature (4)

  • Durst, Doug G., et al., "Improved Single-Trip Multistage Completion Systems for Unconventional Gas Formations", SPE 115260, Jun. 1-14, 2008.
  • Garfield, G., "New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting Fom Conventional Perforating and Gravel-Packing Operations", SPE 96660, Oct. 1-5, 2005.
  • Lorenz, M., et al., "Advancement in Completion Technologies Proves Successful in Deepwater Frac-Pack and Horizontal Gravel-Pack Completions", SPE 103103, Sep. 1-22, 2006.
  • Watson, Don R., et al., "One-Trip Multistage Completion Technology for Unconventional Gas Formations", SPE 114973, Jun. 1-14, 2008.