Logistics planning in a business environment
Abstract
A method for supply chain design may include identifying nodes, links connecting the nodes, and replenishment strategies for moving materials along the links, in a supply chain. The method may also include determining a value indicative of the complexity of the supply chain based on a characteristic of the nodes, links, and replenishment strategies. The method may also include identifying whether core competencies of the nodes are underutilized. The method may also include reducing the complexity of the supply chain to increase utilization of the core competencies of the nodes.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 1.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A system for supply chain design, comprising: a supply chain network operable to: identify nodes, links connecting the nodes, and replenishment strategies for moving materials along the links, in a supply chain; determine whether the supply chain has inefficiencies based on a characteristic of the nodes, links, and replenishment strategies; and reduce the inefficiencies by reducing an underutilization of core competencies of the nodes.
- Claim 2Depends on #1
The system of claim 1 , wherein the supply chain network is operable to determine whether the supply chain has inefficiencies by determining a number of unique paths that material can flow through in the supply chain.
- Claim 3Depends on #2
The system of claim 2 , wherein the supply chain network is operable to determine whether the supply chain has inefficiencies by multiplying the number of unique paths by the number
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 9,851,719 B2 | System and method for executing a project plan at worksite | 2017 | 3 |