Method of surveying a railroad track under load
Abstract
A method of inspecting or surveying a railroad track under load is described wherein a GPS receiver is mounted on top of the track vehicle such as a locomotive, high-rail vehicle or cargo car with data being collected at predetermined intervals to provide horizontal and vertical data for each location.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 2.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of surveying a railroad track with a pair of spaced-apart rails under load, comprising the steps of: positioning a GPS receiver on a track vehicle so that the GPS receiver is in communication with a plurality of GPS satellites; positioning a data collector on the track vehicle which is in communication with the GPS receiver so as to receive data from the GPS receiver regarding the horizontal and vertical position of the GPS receiver; moving the track vehicle along the track whereby the track vehicle will subject the track to the load of the track vehicle; and supplying the data from t
- Claim 2Depends on #1
The method of claim 1 wherein the track vehicle is a locomotive.
- Claim 3Depends on #1
The method of claim 1 wherein the GPS receiver is positioned on
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗