Patents
US 8,316,951 B2#26879895 Most CitedActiveUnited States (USPTO)Utility

Tubular actuator and method

4Forward Citations (#26879895 Global)
0.3/yrCitation Velocity (#26418375 Global)
1.15Citation PageRank (#34457471 Global)
50Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A tubular actuator includes, a restrictor disposed at a tubular that is engageably receptive to a runnable member run thereagainst as long as pressure remains above a latch pressure, the restrictor configured to allow passage of the runnable member after a delay at pressure equal to or below the latch pressure.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 4.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A tubular actuator, comprising a restrictor disposed at a tubular being engagably receptive to a runnable member run thereagainst the restrictor being configured to prevent passage of the runnable member thereby as long as pressure applied against the runnable member engaged therewith remains above a latch pressure while allowing passage of the runnable member after a delay after having reduced pressure to a value equal to or below the latch pressure; wherein the restrictor includes a seat that is seatingly engagably receptive to the runnable member; and wherein the seat is defeatable after th

  2. Claim 2Depends on #1

    The tubular actuator of claim 1 , wherein the seat is radially expandable after the delay.

  3. Claim 3Depends on #1

    The tubular actuator of claim 1 , wherein the restrictor includes a body and the seat is movable

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

Non-Patent Literature (5)

  • Baker Hughes, Baker Oil Tools, Conventional Fishing Technical Unit; Pump Out Sub Product Family No. H14061, Jun. 7, 2005, 1 page.
  • Boscan, J., et al., "Successful Well Testing Operations in High-Pressure/High-Temperature Encironment; Case Histories," SPE 84096, Oct. 2003, pp. 1-15.
  • Brad Musgrove, Multi-Layer Fracturing Solution Treat and Produce Completions, Nov. 12, 2007, pp. 1-23, Schlumberger, U.S.A.
  • G.L. Rytlewski, A Study of Fracture Initiation Pressures in Cemented Cased-Hole Wells Without Perforations, May 15, 2006, pp. 1-10, SPE 100572, Society of Petroleum Engineers, U.S.A.
  • Hoffman, C.R., "One-Trip Sand-Control/Liner Hangar/ Big-Bore Completion System," SPE 101086, Sep. 2006, pp. 1-10.