System and method for deployment of a subsea well intervention system
Abstract
A method, system and apparatus for deploying a subsea well intervention system from a surface vessel to a subsea tree, including connecting a spoolable compliant guide (SCG) to a subsea intervention package; testing the connection; lowering overboard the intervention package into a water column using a primary lifting device; gradually paying out the SCG from a reel thereof as the intervention package is lowered to a seabed; transferring the weight of the intervention package to a secondary lifting device, wherein the intervention package functions as a dead weight to overcome a positive buoyancy of the SCG, a distance between the primary and secondary lifting devices creates and controls a shape of the SCG; and once landed onto a subsea tree with heave compensation, disconnecting the secondary lifting device from the intervention package, and hanging the SCG off at the vessel at deck level.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for deploying a subsea well intervention system from a single surface vessel to a subsea tree, comprising: connecting a spoolable compliant guide (SCG) to a subsea intervention package on a deck of the vessel; testing the connection on the deck of the vessel; lowering the intervention package into a water column using a primary lifting device disposed on the surface vessel, including a winch or a crane, such that the SCG does not support a weight of the intervention package; gradually paying out the SCG from a reel thereof as the intervention package is lowered to a seabed; transferri
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗