Built-in compliance in test structures for leakage and dielectric breakdown of dielectric materials of metallization systems of semiconductor devices
Abstract
In a test structure for determining dielectric breakdown events of a metallization system of semiconductor devices, a built-in compliance functionality may allow reliable switching off of the test voltage prior to causing high leakage currents, which may conventionally result in significant damage. Consequently, further failure analysis may be possible after the occurrence of a dielectric breakdown event.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A test structure for monitoring dielectric characteristics of a metallization system of a semiconductor device, said test structure comprising: a test region formed above a substrate and comprising a plurality of test metal regions formed in a dielectric material of a metallization level; a current limiting structure formed above said substrate, wherein said current limiting structure comprises a resistive structure that is at least partially formed in said dielectric material and has a higher dielectric strength compared to said test region; and an interconnect structure connecting to said te
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (7)
Non-Patent Literature (1)
- Translation of Official Communication from German Patent Office for German Patent Application No. 10 2008 059 504.7 dated Sep. 16, 2009.