Patents
US 8,312,932 B2#47120017 Most CitedActiveUnited States (USPTO)Utility

Capillary hanger arrangement for deploying control line in existing wellhead

1Forward Citations (#47120017 Global)
0.1/yrCitation Velocity (#50456137 Global)
1.00Citation PageRank (#41400836 Global)
50Prior Art Cited
3Claims (2 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

To deploy a capillary string through a wellhead to a downhole safety valve, a control port and a retention port are drilled in an adapter between a casing hanger and a gate valve or elsewhere. The capillary string is connected to a first port of a capillary hanger and installed through the wellhead. The capillary hanger is landed on a tubing hanger, and a side port on the capillary hanger communicates with the control port. Because the side port's location may not align with the control port, operators may need to measure how long the capillary hanger should be. A control line connects to the control port in the wellhead's side to communicate with the capillary line, and a retention rod inserts in the retention port to support the capillary hanger.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.

Claims (3 — 2 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A wellhead capillary string deployment method, comprising: attaching a capillary string to a first port of an internal passage in a capillary hanger; conveying the capillary string through a wellhead; installing the capillary hanger in the wellhead; sealing a second port of the internal passage of the capillary hanger from a bore of the wellhead; and communicating the second port with a control line port defined in a bonnet of a gate valve of the wellhead by connecting a line to an aperture in a seat of the gate valve, the aperture communicating the line with the second port of the capillary h

  2. Claim 2Depends on #1

    The method of claim 1 , further comprising initially tapping the control line port in the bonnet.

  3. Claim 3Independent Claim

    The method of

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 3,494,417 AWell tools197055
US 3,910,352 AIn-tubing safety valve well tool197517
GB 1,419,850 ACoupling for well completion equipment—13
US 4,691,776 ARetrievable well safety valve with expandable external seals198746
US 4,836,287 ASafety gate valve for petroleum wells, permitting operation by artificial flow198925
US 5,092,400 ACoiled tubing hanger199248
US 5,094,294 AWell pump assembly and packer199229
US 5,148,865 AMulti-conversion wellhead assembly199250
US 5,203,409 AGeothermal well apparatus and eccentric hanger spool therefor199332
US 5,305,828 ACombination packer/safety valve assembly for gas storage wells199449
US 5,358,053 ASubsurface safety valve199432
US 5,361,834 AHydraulic release apparatus and method for retrieving a stuck downhole tool and moving a downhole tool longitudinally199442
EP 0,637,675 A1Electrical connection—39
GB 2,287,270 ASpoolable coiled tubing completion system—11
FR 2,734,863 A1Procede et moyens pour la remise en securite d'un puits petrolier en cas de defaut de la ligne de commande hydraulique de sa vanne de securite de fond—14
US 5,662,169 ACuttings injection wellhead system199756
US 5,722,844 AWellhead junction system199820
US 5,727,631 ACoiled tubing hanger199872
WO 9,904,137 A1Simultaneous production and water injection well system—30
US 5,865,255 AFull bore nipple and associated lock mandrel therefor199923
US 6,227,300 B1Slimbore subsea completion system and method2001149
CA 2,310,236 A1Tubing cleanout spool—17
US 2002000315 A1Flow completion apparatus—60
US 2002011336 A1Crossover tree system—83
US 2002134548 A1Wellhead production pumping tree—30
GB 2,377,954 AProduction tree with multiple safety barriers—28
US 2003019631 A1Subsea wellhead equipment—21
US 6,688,386 B2Tubing hanger and adapter assembly200468
US 6,715,554 B1Slimbore subsea completion system and method200477

Non-Patent Literature (5)

  • "Thru-Tubing Intervention: GP Gravel-Pack System," Weatherford International Ltd. (c) 2006.
  • "Thru-Tubing Intervention: PB Packer," Weatherford International Ltd. (c) 2006.
  • "Thru-Tubing Packers: ER Packer," Weatherford International Ltd. (c) 2008.
  • "Thru-Tubing Packers: WidePak(TM) Packer," Weatherford International Ltd. (c) 2008.
  • American Completion Tools, "Flanged Gate Valve Part List," generated on Mar. 12, 2010, obtained from http://www.americancompletion tools.com/wellhead-x-mastree-gatevalves-manifolds/.