Project engineering workflow and tracking integration

10Forward Citations (#10264004 Global)
0.7/yrCitation Velocity (#10643114 Global)
2.32Citation PageRank (#11483747 Global)
3Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system is provided comprising a computer, project forecast, workflow allocations, and incurred expense databases, and an application on the computer extracting from the project forecast database a list of costs and revenues associated with a first and second project, costs comprising approved expenses described in the workflow allocations database and incurred expenses in the incurred expense database. The system determines the first project is operational and for a first subscriber base and the second project is incomplete and is to be for a second subscriber base, completion of the second project pending release of a remaining cost item. The system analyzes an alternate allocation of the cost item to improve the profitability of the first subscriber base, delaying the second project. The system determines the proposed alternate allocation increases the first subscriber base profitability more than a reduction of second subscriber base profitability resulting from the proposed alternate allocation.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A processor-implemented method of project engineering workflow and tracking, comprising: a computer receiving a first message from a client device, the first message requesting at least one manipulation of a cost item associated with a capital asset included in a project, the first message further requesting determination of a total financial impact of the at least one manipulation of the cost item associated with a first subscriber base and a second subscriber base, wherein the capital asset is scheduled to be used by the first subscriber base; the computer accessing a project forecast databa