US 8,306,852 B2#111987249 Most CitedExpiredUnited States (USPTO)Utility

System and method of managing change process

0Forward Citations (#111987249 Global)
0.0/yrCitation Velocity (#111987249 Global)
0.56Citation PageRank (#111987249 Global)
16Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system for managing changes to obviate inefficiencies in business processes involves identifying business activities ( 36 ) being performed and categorising ( 34 ) the activities. Using the category designations ( 34 ) to reveal non-contributory activities, drivers of the causes of inefficiencies are identified. A second set of activities ( 46 ) incorporates outcomes of proposed improvements. Linking ( 38, 40, 42, 44 ) between existing ( 36 ) and improved ( 46 ) activity sets ensures necessary activities are incorporated to achieve the desired outcome. Linkages between the activities within the activity set and the business function that performs them also enables accountability and measures to be assigned.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method implemented in a computer system of deriving a change process in relation to actions performed to achieve a desired result, to produce a change proposal to the actions performed and yield a new procedure of achieving the desired result, the computer implemented method comprising: in relation to a first set of activities identified and recorded as actually performed by each individual involved in order to achieve at least one outcome, a computer program of the computer system designating a category for each activity of the first set of activities according to a predefined set of activi

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (16)

PatentTitleYearCitations
US 5,675,745 AConstructing method of organization activity database, analysis sheet used therein, and organization activity management system199782
US 5,768,586 ANet change management for object-oriented modeling199878
US 5,787,280 AApparatus and method for providing a facility for managing versions and configurations of persistent and transient objects199848
US 5,799,286 AAutomated activity-based management system1998452
WO 0,072,211 A2Method of activity based costing—4
US 6,192,368 B1Apparatus and method for automatically propagating a change made to at least one of a plurality of objects to at least one data structure containing data relating to the plurality of objects200124
US 2001008997 A1Element organization support apparatus, element organization support method and storage medium—19
US 6,295,478 B1Manufacturing process change control apparatus and manufacturing process change control method200122
US 2002026630 A1Enterprise application integration methodology—188
US 2002143595 A1Method and system for compliance management—213
US 2003086536 A1Metrics-related testing of an operational support system (OSS) of an incumbent provider for compliance with a regulatory scheme—100
US 6,636,585 B2Metrics-related testing of an operational support system (OSS) of an incumbent provider for compliance with a regulatory scheme2003122
US 6,996,601 B1Process for managing change within an enterprise200667
US 7,159,237 B2Method and system for dynamic network intrusion monitoring, detection and response2007148
US 7,606,726 B2Interactive survey and data management method and apparatus200912
US 7,624,036 B2Change management analysis and implementation system and method20096

Non-Patent Literature (3)

  • Baker, Sunny; Baker, Kim. Project Management. copyright 2000.
  • Develin, Nick. Overhead Productivity: The Organisational Impact of IT. Work Study, vol. 40, No. 3, 1991, p. 22-3.
  • Youngblood, Mark D. Leadership at the edge of chaos: From control to creativity. Strategy and Leadership v25n5 pp. 8-14 Sep./Oct. 1997.