System and method of forecasting print demand
Abstract
A system and method are provided for performing forecasting with respect to total demand data (including two or more demand components) collected in a print production environment. Each demand component (comprising a set of demand component related points corresponding with a first time scale) may be processed in such a way that a demand component related point can be forecasted with demand component related points corresponded with the second time scale. Both the forecasted demand component related point and demand component related points corresponded with the second time scale can then be corresponded with the first time scale.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A print demand forecasting system for use with a print production system in which multiple print jobs are processed over a selected time interval, comprising: a data collection tool, said data collection tool collecting print demand data for each print job processed during the selected time interval, wherein the print demand data comprises a set of aggregated demand related points corresponding with a first time scale; a memory; and a computer implemented service manager for processing the stored set of aggregated demand related points to obtain a first demand component and a second demand com
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗