Labor resource decision support system
Abstract
A labor resource decision support system, in which labor resource data is maintained across multiple units within an organization using a standardized data record format. A demand measurement for a first type of labor resource having a unique combination of values for fields of the standardized data record format is determined based on input describing forecasted demand for the first type of labor resource within the organization and a supply measurement for the first type of labor resource is determined based on input describing forecasted supply for the first type of labor resource within the organization and the labor resource data. A gap measurement is calculated based on the determined demand measurement and the determined supply measurement and an output is provided based on the calculated gap measurement.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 12.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A labor resource decision support system comprising: one or more computers; and a computer-readable medium coupled to the one or more computers having instructions stored thereon which, when executed by the one or more computers, cause the one or more computers to perform operations comprising: maintaining labor resource data across multiple units within an organization using a standardized data record format, the standardized data record format having a combination of fields that define attributes of a labor resource relevant to labor resource planning for the organization, each field having
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Diaz, et al. "A Tabu Search Heuristic for the Generalized Assignment Problem", European Journal of Operational Research, 2001 No. 132, pp. 22-38.
- Gabriel, European Patent Office, European Search Report for EP 06015914, Apr. 18, 2007, 6 pages.
- Hall, et al. "Scheduling to Minimize Average Completion Time: Off-Line and On-Line Algorithms", Proceedings of the 7th annual ACM-SIAM Symposium on Discrete Algorithms (SODA '96), 1996, 10 pages.
- Harper, et al. "A Genetic Algorithm for the Project Assignment Problem", Journal of Computers and Operations Research, vol. 32, Issue 5, May 2005, 11 pages.
- Jiang, et al. Colored Petri Nets with Changeable Structures (CPN-CS) and their Applications in Modeling One-of-a-Kind Production (OKP) Systems, Computers & Industrial Engineering, No. 41, 2001, pp. 279-308.