Scheduling resources in a penalty-based environment
Abstract
The present invention relates to the problem of scheduling work for employees and/or other resources in a help desk or similar environment. The employees have different levels of training and availabilities. The jobs, which occur as a result of dynamically occurring events, consist of multiple tasks ordered by chain precedence. Each job and/or task carries with it a penalty which is a step function of the time taken to complete it, the deadlines and penalties having been negotiated as part of one or more service level agreement contracts. The goal is to minimize the total amount of penalties paid. The invention consists of a pair of heuristic schemes for this difficult scheduling problem, one greedy and one randomized. The greedy scheme is used to provide a quick initial solution, while the greedy and randomized schemes are combined in order to think more deeply about particular problem instances. The invention also includes a scheme for determining how much time to allocate to thinking about each of several potential problem instance variants.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for resource allocation of a plurality of tasks carrying penalties based on their completion time, the method comprising: identifying the plurality of tasks to be assigned to one or more resources, wherein each job of a plurality of jobs includes multiple tasks ordered by chain precedence, wherein the plurality of jobs include active jobs and queued jobs, and wherein the plurality of tasks are associated with the active jobs; and assigning resources including start times for the plurality of tasks, using a processor, such that expected penalties for completion times of the plurality o
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (14 of 14 total)
References Cited — Backward Prior Art (2)
Non-Patent Literature (1)
- To Schedule or to Execute: Decision Support and Performance Implications Atif et al., 1999.