Patents
US 8,239,249 B1#11683366 Most CitedActiveUnited States (USPTO)Utility

Work allocation tool

9Forward Citations (#11683366 Global)
0.6/yrCitation Velocity (#12343447 Global)
2.04Citation PageRank (#14042421 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Methods and systems are disclosed for automatically allocating work projects to personnel based on work complexity level and level of knowledge and experience of the personnel. In one implementation, the methods and systems provide a work allocation tool that allows a user to input the level of complexity of the work projects according to one or more predefined criteria. The work allocation tool then automatically determines which of the available personnel has the required level of knowledge and experience to complete the work projects. Personnel who have already exceeded a target number or percentage of work projects in a given time period may be automatically excluded from the allocation. The work allocation tool thereafter randomly selects one of the available personnel and automatically allocates the work projects. An administrator interface allows a manager to define each person's target numbers or percentages and to stop further allocations if needed.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 9.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A non-transitory computer-readable medium encoded with computer-readable instructions for processing work projects, the computer-readable instructions comprising instructions executed by a computer to: receive a work project to be allocated to at least one person, wherein the work project includes a life insurance application, the work project having a predefined complexity level, wherein the complexity level is defined by a range of value of a death benefit requested in the life insurance application, the complexity level increasing with the value of the death benefit requested in the life in

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • "Project Management: Task Allocation." Project Management Source, Feb. 5, 2006, [retrieved from the Internet on Jan. 18, 2008 using ].
  • "Project Management: Task Allocation." Project Management Source, Feb. 5, 2006, [retrieved from the Internet on Jan. 18, 2008 using <URL: http://www.projectmanagementsource.com/2006/02/project—managem.html>].
  • "Taskforce 7.5 gains real-time GPS and mapping." FleetOwner, Aug. 9, 2007, [retrieved from the Internet on Jan. 18, 2008 using <URL: http://fleetowner.com/information-technology/news/taskforce-75-gps-mapping/index.html>].
  • "Taskforce 7.5 gains real-time GPS and mapping." FleetOwner, Aug. 9, 2007, [retrieved from the Internet on Jan. 18, 2008 using <URL: http://fleetowner.com/information—technology/news/taskforce—75—gps—mapping/index.html>].
  • Mataric, M., Sukhatme, G., and Ostergaard, E. "Multi-Robot Task Allocation in Uncertain Environments." Autonomous Robots, 2003, vol. 14, p. 255-263.