Adjustments of IUB load measurements
Abstract
A method may include determining whether a discrepancy exists between scheduling headroom computable by a first device and scheduling headroom computable by a second device, determining one or more load measurements that the second device bases its computation of the scheduling headroom if it is determined that the discrepancy exists, modifying the one or more load measurements, and calculating the scheduling headroom based on the modified one or more load measurements.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 8.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method, comprising: determining whether a discrepancy exists between scheduling headroom computable by a first device and scheduling headroom computable by a second device; determining one or more load measurements that the second device bases its computation of the scheduling headroom on, if it is determined that the discrepancy exists; modifying the one or more load measurements; and calculating the scheduling headroom based on the modified one or more load measurements.
- Claim 2Depends on #1
The method of claim 1 , where the modifying comprises: modifying, by the first device, the one or more load measurements, and the method further comprising transmitting, by the first device, the modified one or more load measurements to the second device.
- Claim 3Depends on #1
The method of claim 1 , further comprising: transmitting, by the first device, the one or more load
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (16)
Non-Patent Literature (2)
- 3rd Generation Partnership Project. "HSUPA RRM Conceptual Aspects and Signalling Needs." 3GPP TSG-RAN WG2, Tdoc R2-050436, Scottsdale, US, Feb. 14-18, 2005.
- 3rd Generation Partnership Project. "Measurements and RRM for E-DCH." 3GPP TSG RAN WG2, R2-050865, Beijing, China, Apr. 4-8, 2005.