Patents
US 8,220,095 B2#33084208 Most CitedActiveUnited States (USPTO)Utility

Highway overpass bridge modification system and method

3Forward Citations (#33084208 Global)
0.2/yrCitation Velocity (#32462821 Global)
1.06Citation PageRank (#38429039 Global)
26Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An example method of expanding a highway have a multiple lanes passing under a highway overpass bridge having a center pier is described. The center pier may be between lanes passing in opposite directions. The center pier may be replaced with two replacement central piers having a gap there between. Additional lanes may be added through the gap between the replacement central piers. Various methods of construction and detailed designs for such bridges are also described.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 26 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of expanding a highway having a plurality of lanes in a first direction and a second plurality of lanes in a second direction opposite the first direction, the first and second pluralities of lanes passing under a highway overpass bridge having a center pier located between the first and second pluralities of lanes and a first fixed bridge support on a first outer side outwards from the first plurality of lanes, and a second fixed bridge support on a second outer side outwards from the second plurality of lanes, the center pier, the first fixed bridge support, and the second fixed bri

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (26)

PatentTitleYearCitations
US 3,391,620 AMovable traffic barrier196829
US 3,654,652 ASuspended overpass197212
US 3,794,433 ASegmental precast concrete post-tensioned overpass bridges with cantilevered abutment197437
US 3,811,147 AMobile roadway repair unit197446
US 3,906,687 ASegmental precast concrete post-tensioned overpass bridges with cantilevered abutment197529
US 3,958,890 AApparatus and method for moving roadway lane dividers197638
US 4,181,995 AModular structure for bridges, overpasses and roadways198038
US 4,185,440 AMethod of and parts used in the construction of a prestressed concrete structure198038
US 4,313,383 AGuideway units for elevated guideways198259
US 4,900,193 AConcrete structural member splicing device199030
US 5,090,176 AMethod of positioning concrete slabs on girders19923
JP H083921 ARepair method for existing bridge—8
US 5,577,284 AChannel bridge199640
US 5,846,020 APre-fabricated multi-level roadway structure199835
US 6,345,403 B1Method of bridge construction using concrete diaphragms200236
US 6,347,424 B1Movement absorbing transferring system200234
US 6,453,494 B1Movable bridge center lock20026
KR 20030012013 Aapparatus to distribute bridge load and the method using the same—6
US 6,561,727 B1Ergonomic hybrid transit access corridor particularly for town and urban centers200323
US 6,676,330 B2Method of erecting elevated roadways above existing roadways with minimal disruption of traffic200414
US 6,701,562 B2Span lock with centering guide20043
US 6,795,992 B2Bridge construction method20047
US 6,857,156 B1Modular bridge structure construction and repair system200567
KR 20060075508 ABridge and method of construction for extending a space between bridge piers—4
US 7,478,450 B2Longitudinally offset bridge substructure support system200915
US 7,784,228 B2Mixed-use pedestrian-oriented parking structure20107