Method for efficient deployment of intelligent completions
Abstract
A technique enables efficient deployment of instrumentation gauges in a wellbore. The technique comprises preparing offline a plurality of assemblies having a combined packer and gauge mandrel with an associated gauge. Each assembly is combined with a segment or length of instrumentation cable that is fully spliced with the gauge during offline assembly time. Various splice halves also can be assembled during offline assembly time.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of deploying instrumentation gauges in a wellbore, comprising: providing a plurality of gauge mandrels with gauges; preassembling each gauge mandrel of the plurality of gauge mandrels with a corresponding packer during offline assembly time; determining the number of preassembled gauge mandrel and packer assemblies to be installed downhole in the wellbore; determining a distance between the top of a packer and the bottom of the gauge mandrel which will be disposed sequentially uphole of the packer; cutting a length of instrumentation cable to a length of about the determined distance;
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (19)
Non-Patent Literature (1)
- International Search Report and Written Opinion dated Aug. 5, 2010.