Combining grant, acknowledgement, and rate control commands
Abstract
Embodiments disclosed herein address the need in the art for reduced overhead control with the ability to adjust transmission rates as necessary. In one aspect, a first signal indicates an acknowledgement of a decoded subpacket and whether or not a rate control command is generated, and a second signal conditionally indicates the rate control command when one is generated. In another aspect, a grant may be generated concurrently with the acknowledgement. In yet another aspect, a mobile station monitors the first signal, conditionally monitors the second signal as indicated by the first signal, and may monitor a third signal comprising a grant. In yet another aspect, one or more base stations transmit one or more of the various signals. Various other aspects are also presented. These aspects have the benefit of providing the flexibility of grant-based control while utilizing lower overhead when rate control commands are used, thus increasing system utilization, increasing capacity and throughput.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 5.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
An apparatus, comprising: a scheduler that determines whether to issue a grant to a request for transmission or to adjust a current transmission rate, the determination based at least on one or more channel conditions; and a message generator that: generates a first message comprising a first indicator representing an acknowledgment and a second indicator, the second indicator comprising a grant indicator when the scheduler elects to issue a grant to the request for transmission, and the second indicator alternately comprising a data rate control indicator when the scheduler elects to adjust t
- Claim 2Depends on #1
The apparatus of claim 1 , wherein the data rate control indicator is a rate control command.
- Claim 3Independent Claim
The apparatus of
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗