Autoloop system and method of operation
Abstract
A system and method for operating an autoloop system on an electrical distribution system is provided. The system includes a first branch circuit having a first recloser and a midpoint recloser and a second branch circuit having a second feeder recloser and a midpoint recloser. A tie recloser is electrically coupled between the first branch circuit and the second branch circuit wherein the tie recloser closes only after a fault is detected. A master controller associated with the first and second branch circuits communicates with the reclosers of the first and second branch circuits. The master controller includes a processor for blocking a fast tripping function of a feeder recloser in response to the detection of a fault on the other branch circuit. The portion of a circuit where a fault is detected may be isolated to minimize the portion of the first and second branch circuits without power.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An automatic loop system for an electrical distribution system comprising: a first branch circuit powered by a first feeder, said first branch circuit having a first feeder recloser and a first midpoint recloser electrically coupled in series, said first branch circuit having a first segment opposite said first feeder; a second branch circuit powered by a second feeder, the second branch circuit having a second feeder recloser and a second midpoint recloser electrically coupled in series, said second branch circuit having a second segment disposed opposite said second feeder; a tie recloser el
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (27)
Non-Patent Literature (5)
- "Advanced DER Compliant Distribution Circuits for High Reliability-2006 Update", W. Steeley, 1012771, Technical Update 2006, Electric Power Research Institute, Palo Alto, CA, Dec. 2006.
- "Auto-Loop Improvement", Leeman Hong, Winnie H. Yueh and David J. Allen, IEEE Transactions on Power Delivery, vol. 9, No. 2, pp. 828-832, Apr. 1994.
- "Requirements Based Evaluation of BPL for Power System Sensing, Command and Control Applications", Erich W. Gunther, EPRI and Electricity Innovation Institute, IEEE Standardization of Broadband over Power Line Technologies, Jun. 7, 2004 meeting presentation, available via http://grouper.ieee.org/gro
- "Secondary Network Distribution Systems Background and Issues Related to the Interconnection of Distributed Resources", M. Behnke, W. Erdman, S. Horgan, D. Dawson, W. Feero, F. Soudi, D. Smith, C. Whitaker and B. Kroposki, Technical Report, NREL/TP-560-38079, National Renewable Energy Laboratory, Go
- Written Opinion of the International Searching Authority mailed Mar. 5, 2010; references cited in PCT are listed herein.