Method of release and product flow management for a manufacturing facility
Abstract
A method and computer program product for scheduling product lots through operations of a manufacturing line. The method including: selecting a set of sequential operations required to manufacture the lots; partitioning the product lots into designated lots and non-designated lots; and generating a release schedule for each of the non-designated lots into one or more operations of the set of sequential operations; generating a release schedule for each of the designated lots into each operation of set of sequential operations such that for each designated lot a total amount of time measured from completion of a first operation of the set of sequential operations through start of a last operation of the set of sequential operations does not exceed a target amount of time for the designated lots.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method, comprising: selecting a set of sequential operations, said set of sequential operations consisting two or more operations from a first operation to a last operation; partitioning lots of semiconductor product wafers into designated lots and non-designated lots, said designated lots containing product known to increase in yield if a target time through said set of sequential operations is not exceeded compared to designated lots that exceed said target time, said target amount of time measured from completion of said first operation to start of said last operation, said non-designated
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (4)
- Fordyce, et al.; 1990, Logistics Management System (LMS), Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing; The Institute of Management Sciences, Interfaces 20, Jan. 1-Feb. 1990; pp. 43-64.
- Fordyce, et al.; 1992, Logistics Management System (LMS): An Advanced Decision Support System for the Fourth Decision Tier Dispatch or Short-Interval Scheduling; Production and Operations Management Society, vol. 1, No. 1, Winter 1992; pp. 70-86.
- Notice of Allowance (Mail Date Sep. 5, 2008) for U.S. Appl. No. 10/908,420, filed May 11, 2005.
- Park et al., An Overall Framework for Generating Simulation-Based Cycle Time-Throughput Curves, Proceedings of the 2001 Winter Simulation Conference, 2001.