Patents
US 8,122,425 B2#9819912 Most CitedActiveUnited States (USPTO)Utility

Quality software management process

10Forward Citations (#9819912 Global)
0.7/yrCitation Velocity (#10581551 Global)
4.12Citation PageRank (#4540276 Global)
36Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A quality management framework system and method for operating a quality plan in a product development organization having quality objectives. The system includes a plurality of computer implemented tools accessible by users for operating a plurality of quality processes. Data relative to the quality processes is collected and aggregated to generate quality reports. Reports are analysed and problems are detected through a defect prevention process. Quality actions are initiated in a feedback quality management action tracking process.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 36 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system including a processor for operating a quality plan in a product development organization comprising a plurality of members and having quality objectives for product development projects and analyzing a quality metrics report, the system comprising: the processor defining a set of quality processes adapted to quality objectives required by an organization, wherein the set of quality processes includes: a tracking process for identifying an issue in the product development projects, the tracking process being an internal project management tracking process that reports a status of curre

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (36)

PatentTitleYearCitations
US 5,208,765 AComputer-based method and system for product development1993482
US 5,416,694 AComputer-based data integration and management process for workforce planning and occupational readjustment1995349
US 5,706,452 AMethod and apparatus for structuring and managing the participatory evaluation of documents by a plurality of reviewers1998349
US 5,734,837 AMethod and apparatus for building business process applications in terms of its workflows1998687
US 5,799,286 AAutomated activity-based management system1998452
US 5,848,271 AProcess and apparatus for controlling the work flow in a multi-user computing system1998103
US 6,073,107 AParametric software forecasting system and method2000128
US 6,088,717 AComputer-based communication system and method using metadata defining a control-structure2000837
JP 2000235488 AQuality and production management system—3
US 6,222,535 B1System and method for facilitating issue tracking200158
US 6,226,784 B1Reliable and repeatable process for specifying developing distributing and monitoring a software system in a dynamic environment2001163
US 2001032105 A1Method and system for introducing a new project initiative into a business—48
US 2002023176 A1Collaborative process management system and method—39
US 2002052862 A1Method and system for supply chain product and process development collaboration—177
US 2002147632 A1Contact center management—30
US 2002147620 A1Software quality assurance management system—17
US 2003009740 A1Dual & parallel software development model—109
US 6,519,763 B1Time management and task completion and prediction software2003322
US 6,553,365 B1Computer readable electronic records automated classification system2003261
US 6,567,783 B1Communication across one or more enterprise boundaries regarding the occurrence of a workflow event2003113

Non-Patent Literature (5)

  • "Appendix 1: Design and Construction Changes and Problems at New US Embassy in Moscow-Quality Assurance, Part 1", Briefing Report to Chairman, Com on the Budget, US Senate, Wash, DC, General Accounting Office, Apr. 1987, GAO-NSAID-87-125, pp. 12-13.
  • Addison et al., Controlling software project risks: an empirical study of methods used by experienced project managers, Sep. 2002, pp. 128-140, .
  • Addison et al., Controlling software project risks: an empirical study of methods used by experienced project managers, Sep. 2002, pp. 128-140, <http://delivery.acm.org/10.1145/590000/581525/p128-addison.pdf>.
  • Baresi et al., "WIDE Workflow Development Methodology," p. 19-28, 1999 ACM.
  • Bell et al., "Inside Intel-Coping with Complex Projects," Abstract, Engineering Management Journal, Feb. 2001, IEEE.