Patents
US 8,104,538 B2#4317722 Most CitedActiveUnited States (USPTO)Utility

Fracturing with telescoping members and sealing the annular space

20Forward Citations (#4317722 Global)
1.4/yrCitation Velocity (#3817252 Global)
2.46Citation PageRank (#10411342 Global)
16Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A fracturing operation is done in open hole. The annular space is spanned by telescoping members that are located behind isolation valves. A given bank of telescoping members can be uncovered and the telescoping members extended to span the annular space and engage the formation in a sealing manner. Pressurized fracturing fluid can be pumped through the telescoped passages and the portion of the desired formation fractured. In a proper formation, cementing is not needed to maintain wellbore integrity. In formations that need annular space isolation, the string in a preferred embodiment can have an external material that grows to seal the annular space in lieu of a traditional cementing operation.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 20.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A formation fracturing method, comprising: running a completion string that comprises a plurality of wall passages into open hole; spanning an annulus around said string with at least some of said passages that engage the formation while leaving said annulus substantially open to the formation; delivering pressurized fluid through at least one of said passages to fracture the formation; sealing said annulus before or after said delivering with at least one seal supported by said completion string when said seal on said completion string is run into said open hole.

  2. Claim 2Depends on #1

    The method of claim 1 , comprising: making said seal enlarge to a sealing position from delivery into said open hole.

  3. Claim 3Depends on #1

    The method of claim 1 , comprising: selectively closing access to at least one of said passages from within said string.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Coronado, Martin P., et al., "Development of a One-Trip ECP Cement Inflation and Stage Cementing System for Open Hole Completions", IADC/SPE 39345, Mar. 1998, 473-481.
  • Garfield, G., "New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting From Conventional Perforating and Gravel-Packing Operations," SPE 96660, Oct. 2005, pp. 1-5.
  • Garfield, G., et al., "Novel Completion Technology Eliminates Formation Damage and Reduced Rig Time in Sand Control Applications," SPE 93518, Mar. 2005, pp. 1-5.
  • Henriksen, K.H., et al., "Integration of New Open Hole Zonal Isolation Technology Contributes to Improved Reserve Recovery and Revision in Industry Best Practices", SPE 97614, Dec. 2005, 1-6.
  • Hill, Leo E., et al., "Completion Tools Proven Successful in Deepwater Frac Packs and Horizontal Gravel-Packing", IADC/SPE 74492, Feb. 2002, 1-15.