Method of improving waterflood performance using barrier fractures and inflow control devices
Abstract
The present invention is directed to a method of hydrocarbon production from a hydrocarbon reservoir. The method includes providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Hydrocarbons are drained from the reservoir into at least one production interval of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 9.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of hydrocarbon production from a hydrocarbon reservoir comprising: providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir; forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore; providing an injection well into the reservoir; injecting a fluid into the reservoir through the injection well to displace hydrocarbons within the reservoir toward the at least one productive interval of the wellbore; and draining hydrocarbons from the reservoir into at least one produc
- Claim 2Depends on #1
The method of claim 1 , wherein
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (9 of 9 total)
References Cited — Backward Prior Art (29)
Non-Patent Literature (5)
- A. Bryce Cunningham, et al.; Field Testing and Study of Horizontal Water Injectors in Increasing Ultimate Recovery From a Reservoir in Thamama Formation in a Peripheral Water Injection Scheme in a Giant Carbonate Reservoir, United Arab Emirates; Abu Dhabi International Petroleum Exhibition & Confere
- Alex Turta, et al.; Toe-To-Heel Waterflooding. Part II: 3D Laboratory Test Results; SPE Annual Technical Conference and Exhibition; Denver, Colorado (Oct. 5-8, 2003); SPE 84077.
- B.W. McDaniel, et al.; "Evolving New Stimulation Process Proves Highly Effective in Level 1 Dual-Lateral Completion," SPE Paper 78697, Oct. 23, 2002.
- B.W. McDaniel, et al.; Limited-Entry Frac Applications on Long Intervals of Highly Deviated or Horizontal Wells; 1999 SPE Annual Technical Conference and Exhibition; Houston, Texas (Oct. 3-6, 1999); SPE 56780.
- B.W. McDaniel, et al.; Overview of Stimulation Technology for Horizontal Completions Without Cemented Casing in the Lateral; SPE Asia Pacific Oil and Gas Conference and Exhibition; Melbourne, Australia (Oct. 8-10, 2002); SPE 77825.