Patents
US 8,095,407 B2#88700743 Most CitedActiveUnited States (USPTO)Utility

System and method for service parts planning in a multi-echelon network

0Forward Citations (#88700743 Global)
0.0/yrCitation Velocity (#88700743 Global)
0.56Citation PageRank (#88700743 Global)
46Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Embodiments of the invention are generally directed to a system and method for service parts planning in a multi-echelon network having one or more service parts. For at least a subset of the one or more service parts, a calculation is performed to determine a location within the multi-echelon network at which allocating the service part provides the greatest gain in system availability per item cost. In one embodiment, the calculations take into consideration violations of incremental optimal allocation. In an embodiment, the calculations take into consideration violations of convexity.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 46 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    An apparatus comprising: a memory to store a data structure representing a multi-echelon network having one or more service parts; and a processor and logic executable thereon to, for each of at least a subset of the one or more service parts, calculate, for the service part, a location within the multi-echelon network, for which allocating the service part to the location provides a greatest gain in system availability per item cost, wherein system availability defines a probability that the multi-echelon network is functioning; allocate an additional instance of the service part to the locat

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (46)

PatentTitleYearCitations
US 5,630,070 AOptimization of manufacturing resource planning1997578
US 6,216,109 B1Iterative repair optimization with particular application to scheduling for integrated capacity and inventory planning2001220
US 2001001896 A1Parts distributing method and mounting system—8
US 6,278,978 B1Agent scheduling system and method having improved post-processing step200190
US 2002065764 A1Marketing and purchasing components and services—39
US 2002116281 A1Internet-based systems and methods for reallocating and selling used industrial equipment and machinery—72
US 2002138316 A1Value chain intelligence system and methods—290
US 2002161725 A1Repair parts ordering and receipt inspection system—8
US 2002165782 A1Method, system and software for inventory management—33
WO 02,091,260 A1Information providing method and information providing system—3
JP 2002328984 AInformation presentation method and information presentation system—16
US 2002174000 A1Method for managing a workflow process that assists users in procurement, sourcing, and decision-support for strategic sourcing—226
US 2003033179 A1Method for generating customized alerts related to the procurement, sourcing, strategic sourcing and/or sale of one or more items by an enterprise—447
US 2003061088 A1Method for forecasting and managing multimedia contacts—21
US 6,560,508 B1Standard parts metering system200326
US 6,574,717 B1Techniques for time-based retention of a reusable resource200392
US 2003105684 A1Allocating inventory based on allocation priorities—45
US 2003158769 A1Management method based on stream management in supply chain product management—34
US 6,681,990 B2Item tracking systems and real-time inventory management2004160
US 2004030611 A1Collaborative commerce hub—62
US 2004084526 A1Systems and methods of inventory management utilizing unattended facilities—57
US 2004084527 A1Systems and methods of inventory management utilizing unattended facilities—92
US 2004158508 A1Shipping-management system and shipping-management method—17
US 2004210489 A1System and method for dynamic allocation of products to retailers—52
US 6,843,415 B2Event-based communication in a distributed item tracking system2005110
US 6,845,909 B2Systems and methods of inventory management utilizing unattended facilities200582
US 6,850,809 B1Methods, devices and systems for splitting an integrated manufacturing and distribution plan for use by separate manufacturing and distribution execution systems200526
US 6,866,195 B2Systems and methods of inventory management utilizing unattended facilities200568
US 2005060270 A1Methods and apparatus for inventory allocation and pricing—79
US 2005103842 A1Systems and methods of inventory management utilizing unattended facilities—46

Non-Patent Literature (5)

  • A Sleptchenko, M C van der Heijden, & A van Harten. (2003). Trade-off between inventory and repair capacity in spare part networks. The Journal of the Operational Research Society, 54(3), 263-272.
  • An inventory-theoretic approach to product assortment and shelf-space allocation Timothy L Urban Journal of Retailing; Spring 1998; 74, 1; ABI/INFORM Global p. 15.
  • Athikomrattanakul, P., "Pull-based supply chain allocation for multi-product in multi-echelon distribution system", Ph.D. dissertation, Iowa State University, United States, (2002).
  • Carr, S. M., et al., "Competition in Multiechelon Assembly Supply Chains", Management Science, vol. 51, Iss. 1, (Jan. 2005), pp. 45-59.
  • Chen, F., "Multi-echelon stochastic inventory systems with centralized stock information", Ph.D. dissertation, University of Pennsylvania, United States, (1993).