A storm water run-off percolation rate test system includes a turbid water generator having a silt or sediment source providing silt into a mixing tank. A pipeline carries turbid water from the mixing tank to a test pit or test site. A flow meter measures the amount of turbid water moved into the test pit. Detectors detect a water level in the test pit. A controller automatically controls the turbid water generator and flow of turbid water into the test pit, and records data on the amount of turbid water provided into the test pit over time, to determine a percolation rate. In a method for determining a percolation rate, turbid water is created and used in the percolation rate testing, to more accurately simulate run-off.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: A] moving a controlled amount of silt and a controlled amount of water into a mixing tank to make turbid water; B] providing the turbid water into an in-ground test site; C] detecting when the turbid water level in the test site drops below a first specified level; D] providing additional turbid water into the test site until the water level in the test site exceeds a second specified level; E] repeating steps B-D over a period of time; and F] recording data while performing one or more of steps C-E.

  2. Claim 2Depends on #1

    The method of claim 1 further comprising providing the turbid water by moving the silt from a silt vessel into the mixing tank and mixing the silt and water in the mixing tank, to make turbid water.

  3. Claim 3Depends on #2

    The method of claim 2 further comprising controlling flow of water into the mixing tank based on a measureme