Method for predicting cycle time
Abstract
A method for predicting cycle time comprises the steps of: collecting a plurality of known sets of data; using a clustering method to classify the known sets of data into a plurality of clusters; using a decision tree method to build a classification rule of the clusters; building a prediction model of each cluster; preparing data predicted set of data; using the classification rule to determine that to which clusters the predicted set of data belongs; and using the prediction model of the cluster to estimate the objective cycle time of the predicted set of data. Therefore, engineers can beforehand know the cycle time that one lot of wafers spend in the forward fabrication process, which helps engineers to properly arrange the following fabrication process of the lot of wafer.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer implemented predicting cycle time, comprising the following steps: collecting a plurality of known sets of data, the known sets of data having at least two reference cycle times and an objective cycle time; using a clustering method to classify the known sets of data into a plurality of clusters; using a decision tree method to build a classification rule of the clusters; building a prediction model of each cluster, the prediction model indicating the relationship of the variation between the reference cycle times and the objective cycle time; preparing a predicted set of data, the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 9,606,530 B2 | Decision support system for order prioritization | 2017 | 2 |
| US 2014343711 A1 | Decision support system for order prioritization | — | 25 |
References Cited — Backward Prior Art (4)
Non-Patent Literature (5)
- Backus et al., P., "Factory Cycle-Time Prediction With a Data-Mining Approach", IEEE Transactions on Semiconductor Manufacturing, vol. 19, No. 2, pp. 252-258, May 2006.
- Chang et al., P., "Evolving CBR and Data Segmentation by SOM for Flow Time Prediction in Semiconductor Manufacturing Factory", pp. 421-429, May 31, 2008.
- Chen et al., C., "A Bayesian Model of Cycle Time Prediction", IIE Transactions 33, pp. 921-930, 2001.
- Chen, T., "A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer Fab", Neural Processing Letters 24, pp. 271-288, 2006.
- Chen., T., "A Fuzzy Back Propagation Network for Output Time and Prediction in a Wafer Fab", Applied Soft Computing pp. 211-222, 2003.