Analysis of energy-related factors for selecting computational job locations
Abstract
The selection of an optimal data center location for running a computational workload is based on multiple energy criteria. The location is chosen based on multivariate and predictive analysis of total direct and indirect energy costs, and other user-defined factors. Among the direct and indirect costs are power costs and cooling costs as well as structural and other details of a given data center. Among the other factors to be considered that can have an impact on present and future costs are weather patterns, data and forecasts, availability of energy providers, and energy attributes. A forecaster factors these direct and indirect costs along with extrinsic information such as historical trends and predictive sources into a forecast which is then input to a decision engine along with user defined criteria and with anticipated compute tasks and requirements to select a final location or locations for handling the workload.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 19.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system, comprising: a processing unit, computer readable memory and a computer readable storage medium; first program instructions to collect energy-related data from each of a plurality of different data center sources, the energy-related data comprising power costs, weather data, energy attributes, and cooling costs for each of the plurality of different data center sources; second program instructions to predict projected energy consumption forecasts for processing a compute job at each of the different data center sources as a function of a workload requirement of the compute job and the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗