Patents
US 8,082,274 B2#26402862 Most CitedActiveUnited States (USPTO)Utility

Scheduling application allowing freeform data entry

4Forward Citations (#26402862 Global)
0.3/yrCitation Velocity (#27639769 Global)
1.21Citation PageRank (#31799643 Global)
41Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A project management application provides an environment in which a user can transform a project sketch, which is based on mostly “freeform” data, into a defined project plan. The project management application facilitates the mixture of freeform task attribute values with structured attribute values of one or more project tasks. The project management application can utilize an internal calculation model to manage the relationships between task attribute values despite accepting freeform values for task attributes. The project management application calculates the attribute values to the extent allowed by the calculation model's recognition of the attribute values.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 41 · Forward citations: 4.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of creating a project plan on an electronic computing device, the method comprising: receiving instructions at the electronic computing device to create a task for the project plan, the project plan having a plurality of tasks, the project plan comprising a plurality of rows and columns, each row of the project plan corresponding to a unique task, each row of the project plan including a designation field, a start date field and a completion date field, the designation field comprising one letter character that designates a task as being either a freeform task or a structured task, th

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (41)

PatentTitleYearCitations
US 5,907,829 ASchedule management system and recording medium1999107
US 6,138,141 AServer to client cache protocol for improved web performance2000103
US 6,154,753 ADocument management system and method for business quality modeling2000175
US 2001029460 A1Schedule management system—16
US 6,424,983 B1Spelling and grammar checking system2002207
US 6,442,567 B1Method and apparatus for improved contact and activity management and planning2002129
US 2003046220 A1Apparatus, method and program for supporting trade transaction—34
US 6,687,678 B1Use's schedule management system200449
US 2004054566 A1Method and apparatus for event driven project management—61
US 6,839,722 B2Method for referencing time-related entries in different files in a planning program20057
US 2005080715 A1Method and apparatus for creating and conducting on-line charitable fund raising activities—21
US 6,889,196 B1Method and apparatus for planning, monitoring, and illustrating multiple tasks based on user defined criteria and predictive ability200582
US 6,901,407 B2System and method for updating project management scheduling charts200522
US 2005138631 A1System and method for providing metadata interaction and visualization with task-related objects—93
US 2005160084 A1Apparatuses and methods for dynamic creation of phase gantt charts—72
US 2005197999 A1System and method for task management—23
US 6,944,622 B1User interface for automated project management200562
US 2005216111 A1Planning operation management support system, and planning operation management support program—136
US 2005278208 A1Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data—38
US 2006004618 A1Explaining task scheduling for a project—55
US 2006029079 A1Pipeline scheduler including a hierarchy of schedulers and multiple scheduling lanes—57
US 2006070020 A1Method and system for providing cross project commitments—48
US 2006070019 A1Methods and systems for caching and synchronizing project data—82
US 2006136241 A1Method and system for work scheduling on calendars—14
US 2006140192 A1Flexible mesh structure for hierarchical scheduling—15
US 2006200372 A1Method and system for generating a timeline associated with a project schedule—64

Non-Patent Literature (5)

  • Applied Software Project Management; Copyright 2005, 3 pages.
  • International Search Report and Written Opinion for PCT/US2008/065993 mailed Nov. 12, 2008, 10 pages.
  • International Search Report and Written Opinion issued in PCT/US2010/034618 mailed Dec. 1, 2010 (326950-02).
  • Meyers et al.; PASSAT: A User-centric Planning Framework; 2002; pp. 1-10.
  • Oracle Project Management; http://www.oracle.com/applications/project-management.html: admitted by Applicants as prior art as of Jun. 27, 2007; pp. 1-5.