US 8,079,417 B2#16145164 Most CitedActiveUnited States (USPTO)Utility

Wireline retrievable dsg/downhole pump system for cyclic steam and continuous steam flooding operations in petroleum reservoirs

7Forward Citations (#16145164 Global)
0.5/yrCitation Velocity (#17661967 Global)
1.28Citation PageRank (#29305936 Global)
16Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A non-rigid carrier conveys a pump and/or the steam generator through a bore of the production tubing string to support enhanced oil recovery operations. An annular space separates the production tubing string and a wall of a wellbore intersecting a hydrocarbon-bearing subterranean formation. Using the non-rigid carrier, the steam generator is conveyed into the wellbore and operated to inject hot gases into the formation through the perforations in the casing. Afterwards, the steam generator is conveyed out of the cased wellbore and the pump is conveyed into the cased wellbore and operated to pump hydrocarbons to the surface. For cyclic injection operations, the pump may be retrieved to the surface and the steam generator may be returned into the well. The production tubing string, such as a production tubing, remains in the well while the pump and/or the steam generator are conveyed up and down the cased well. A base installed in the cased well receives either the pump or the steam generator.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 7.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of recovering heavy oil hydrocarbons to the surface of the earth from a subterranean formation, comprising:(a) positioning a steam generator in a wellbore intersecting the subterranean formation, wherein the steam generator is placed on a landing nipple;(b) installing a production tubing string in the wellbore;(c) conveying the steam generator to the surface via a bore of the production tubing string; and (d) conveying a pump into the wellbore via the bore of the production tubing string, wherein the pump is placed on the landing nipple; and wherein a packer is located between the wel

  2. Claim 2Depends on #1

    The method of claim 1 wherein said wellbore is at least partially cased.

  3. Claim 3Depends on #1

    The method of claim 1 further comprising: installing a base in the wellbore; positioning the steam generat