Patents
US 8,065,040 B2#26937009 Most CitedExpiredUnited States (USPTO)Utility

On-site power plant control including adaptive response to transient load requirements

4Forward Citations (#26937009 Global)
0.3/yrCitation Velocity (#27716661 Global)
1.14Citation PageRank (#34952190 Global)
21Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

An on-site power plant ( 24 ) has a controller ( 40 ) that selectively controls operation of prime movers ( 26, 28, 30 ). In one example, the controller ( 40 ) changes the number of operating prime movers responsive to a transient in a load ( 22 ) requirement while continuing to operate at least one of the prime movers. One example includes prioritizing the prime movers ( 26, 28, 30 ) for operation based upon the needs of a cogeneration unit ( 32, 34, 36 ) associated with the prime movers for providing a temperature control function within a facility. Another example includes controlling operation of the prime movers based upon a capacity for fueling the prime movers.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 4.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of controlling an on-site power plant that has a plurality of prime movers for generating power, comprising: operating a plurality of prime movers to generate a first level of power for a load; and adjusting how the prime movers operate responsive to a down transient in the load while continuing operating at least one of the plurality of prime movers to generate a second, lower level of power for the load.

  2. Claim 2Depends on #1

    The method of claim 1 , including detecting the down transient in the load; determining an amount of decrease in power required by the load corresponding to the detected down transient; and adjusting how the prime movers operate so that the on-site power plant does not provide more power than is required by the load.

  3. Claim 3Depends on #2

    The method of claim 2 , including determining how many of the prime movers to turn off so that a di

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (21)

PatentTitleYearCitations
US 3,646,356 AControl system for starting up and synchronizing a plurality of generators and method of operation197223
US 3,733,095 AElectrical power generating plant197328
US 4,018,044 AElectronic fuel control for a gas turbine engine197729
US 4,154,000 ARemote level sensing instrument197955
US 4,179,742 ASystem for intelligently selecting the mode of control of a power plant197913
US 4,208,591 AGas turbine power plant control apparatus including a turbine load control system198051
US 4,222,229 AMultiple turbine electric power plant having a coordinated control system with improved flexibility1980108
US 4,258,545 AOptimal control for a gas turbine engine198181
US 4,430,573 ALoad control for energy converters19848
US 4,875,168 AEngine speed control apparatus198931
US 6,376,937 B1Meter collar with interface for connecting on-site power source, and the interface itself200221
US 6,522,030 B1Multiple power generator connection method and system200372
US 6,639,331 B2Parallel generator power system200356
US 2003224833 A1Cellular base station power generator having remote monitoring and control—33
US 2004027004 A1On-line control of distributed resources with different dispatching levels—50
US 6,710,055 B2Disubstituted bicyclic heterocycles, the preparation thereof, and their use as pharmaceutical compositions200422
US 2005096759 A1Distributed power generation plant automated event assessment and mitigation plan determination process—28
US 6,978,620 B2Start-up method for power plant20059
US 7,112,893 B1Power generating wind turbine200633
US 7,116,010 B2Control of small distributed energy resources200696
US 7,279,800 B2Waste oil electrical generation systems20075

Non-Patent Literature (3)

  • International Search Report and Written Opinion of the International Searching Authority for International application No. PCT/US05/46032 mailed Aug. 29, 2006.
  • Lasseter et al: "Integration of distributed energy resources the CERTS MicroGrid concept", White Paper Consortium for Electric Reliability Technology Solutions, XX, XX, No. LBNL-50829, Apr. 1, 2002, pp. 1-27, XP002968309.
  • Supplementary European Search Report for Application No. EP 05 85 4697 mail Oct. 7, 2010.