Patents
US 8,050,993 B2#9105655 Most CitedActiveUnited States (USPTO)Utility

Semi-quantitative risk analysis

11Forward Citations (#9105655 Global)
0.7/yrCitation Velocity (#10404209 Global)
2.63Citation PageRank (#9397134 Global)
28Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A semi-quantitative analysis on the risk management process increases the possibility of performing an accurate risks comparison, making easier the identification of which risks shall be prioritized and shall receive the greatest mitigation efforts. Specifically, the semi-quantitative risk analysis enables an improved risks comparison for evaluating the consequences of each risk considering its impacts on the project's Net Present Value (NPV), reflecting the project's cash flow at different times. The use of such method makes the prioritization process more efficient, helping the managers and other personnel involved on the process to focus their efforts to the most critical risks for the project's success. In this sense, the risk management process becomes more efficient and better able to provide better support to the project decision makers.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 11.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented project risk assessment method comprising: a computer receiving and storing project data, wherein said project data defines the net present value (NPV) of a project over a time period; said computer identifying a plurality of project risks using said project data; said computer, for each of the project risks, defining an impact to the NPV and a probability of occurrence, said defining the impact to the NPV including determining the timing of the impact to the NPV; said computer continuously prioritizing each of the project risks in real-time according to the risks' r

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (28)

PatentTitleYearCitations
US 6,088,678 AProcess simulation technique using benefit-trade matrices to estimate schedule, cost, and risk2000113
US 2002138318 A1Integrative risk management system and method—77
US 2002194040 A1Computerized systems and methods for accessing and displaying project risk management information—20
US 2002198750 A1Risk management application and method—69
US 2003023470 A1Project risk assessment—48
US 2003074291 A1Integrated program for team-based project evaluation—27
US 2003088446 A1System for assessing the risk of projects—14
US 2003135399 A1System and method for project optimization—142
US 2003225605 A1Project risk management system and project risk management apparatus—44
US 2004015376 A1Method and system to value projects taking into account political risks—100
US 2004148566 A1Method to evaluate project viability—24
US 2004254959 A1Method and computer system for project portfolio management—13
US 2005060213 A1Web-based risk management tool and method—83
US 2005065805 A1Tool and method for operations, management, capacity, and services business solution for a telecommunications network—68
US 6,895,383 B2Overall risk in a system2005102
US 2005278248 A1Simulation program and simulation apparatus—10
US 2005283751 A1Method and apparatus for automated risk assessment in software projects—99
US 2006173762 A1System and method for an automated project office and automatic risk assessment and reporting—77
US 2006184483 A1Predictive analytic method and apparatus—26

Non-Patent Literature (5)

  • "Developing a risk management matrix for effective project planning-an empirical study", Sumit Datta, S K Mukherjee. Project Management Journal. Sylva: Jun. 2001. vol. 32, iss. 2; p. 45, 13 pages.
  • "Identifying, justifying and prioritizing technical projects", Jonathan Worstell, Jeffrey Worstell, John Worstel. Chemical Engineering Progress. New York: Mar. 2002. vol. 98 iss. 3: p. 72, 8 pgs.
  • "The application of risk management in Infrastructure Construction Projects", Ali, Rashed, Cost Engineering, Aug. 2005, v47n8 pp. 20-27.
  • J. Worstell et al., "Identifying, justifying and prioritizing technical projects," Chemical Engineering Progress, New York: Mar. 2002, vol. 98, Iss. 3, p. 72 (8 pages).
  • R. Ali, "The application of risk management in Infrastructure Construction Projects," Cost Engineering, Aug. 2005, vol. 47, No. 8, pp. 20-27.