Patents
US 8,041,967 B2#5676647 Most CitedExpiredUnited States (USPTO)Utility

System and method for controlling power to resources based on historical utilization data

16Forward Citations (#5676647 Global)
1.1/yrCitation Velocity (#5987131 Global)
3.46Citation PageRank (#6024970 Global)
9Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A method comprises collecting utilization data for a resource, and predicting by a power management system, based on the collected utilization data, future utilization of the resource. The method further comprises controlling, by the power management system, power to the resource, based at least in part on the predicted future utilization of the resource. In one embodiment, the utilization data is collected for a plurality of resources that are operable to perform tasks, and the method further comprises determining, by the power management system, how many of the resources are needed to provide a desired capacity for servicing the predicted future utilization of the resources for performing the tasks. The method further comprises configuring, by the power management system, ones of the resources exceeding the determined number of resources needed to provide the desired capacity in a reduced power-consumption mode.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 16.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method comprising: collecting utilization data for a resource; inputting parameters specifying a desired capacity of said resource; predicting by a power management system, based on said collected utilization data, future utilization of said resource, wherein said parameters further specify that an amount of extra capacity above said predicted future utilization is to vary based on a volatility in said predicted future utilization of said resource; and controlling, by the power management system, power to said resource, based at least in part on said predicted future utilization of said reso

  2. Claim 2Depends on #1

    The method of claim 1 wherein said collecting, predicting, and controlling comprise: collecting utilization data for a plurality of resources; predicting by said power management system, based on said collected utilization data,