Patents
US 8,041,526 B2#103273968 Most CitedActiveUnited States (USPTO)Utility

Method, apparatus and system for reducing waste in production systems

0Forward Citations (#103273968 Global)
0.0/yrCitation Velocity (#103273968 Global)
0.56Citation PageRank (#103273968 Global)
15Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A production system includes at least one production component having a production cycle which is interruptible by a detected production failure, at least one detector configured to monitor an output of the at least one production component, the detector configured to detect a production failure and to generate a signal indicative of the production failure, and a control unit. The control unit is configured to, in response to the signal from the detector, cause the respective production component to reject production material for a first predetermined duration of time, and in response to the expiration of the first predetermined duration of time, to slow down production for at least a second predetermined duration of time. The control unit can further return the production system to a normal production state in response to receiving a restart signal before the expiration of the first or second predetermined duration of time.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method for use in a production line, comprising: in response to a production failure detected by at least one electronic hardware monitoring at least one of a quantity and a quality of production material in said production line, rejecting said production material for a first predetermined duration of time after the detected failure; and in response to expiration of the first predetermined duration of time, slowing down production for at least a second predetermined duration of time.

  2. Claim 2Depends on #1

    The method of claim 1 , further comprising: in response to expiration of the second predetermined duration of time, shutting down the production line.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein the production failure comprises at least one of a quantity of production material existing in said production line not matching a predetermined quantity, a production

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (1)

  • Search Report Dated Jan. 2007.