An annular preform is constructed of predeterminable width and height and filled with a predeterminable quantity of a fluid grouting material. After setting of the grouting material and removal of the formwork a ring is placed on the surface of the set grouting material and a lower pylon segment is placed on the ring and connected thereto.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 25.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of erecting a pylon of a wind power installation, comprising: forming a foundation with segment anchors, wherein continuous connecting elements are coupled to the segment anchors and project beyond a top side of the foundation by a predetermined amount; constructing an annular formwork of predeterminable width and height on the top side of the foundation; filling the formwork with a predeterminable amount of a fluid grouting material that levels itself; allowing the grouting material to set such that a leveled surface is automatically available; removing the formwork; placing a ring,

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗