Method for finding the correlation between the tool PM and the product yield
Abstract
A method for finding the correlation between tool PM (prevention maintenance) and the product yield of the tool is disclosed. The method uses a moving average method to magnify a curve trend that is formed by the product yield data that is captured during a predetermined days before PM and after PM. The magnified curve trend is shown by a Cumulative sum chart. The Cumulative sum chart is analyzed for informing related workers of the effect between the tool PM and the product yield, so as to accurately estimate PM timing. Thereby, via the method, the effect between the tool PM and the product yield may be determined, which serves as an important reference for workers to execute further PM.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for finding the correlation between prevention maintenance of a tool and the product yield of the tool, the method comprising: (a) collecting a plurality of product yield data of a plurality lots of wafers that are correspondingly formed from being processed by a plurality of tools of a production line; (b) according to the aforementioned product yield data, respectively calculating a yield gap between an average yield a predetermined days before the prevention maintenance of the tool and an average yield a predetermined days after the prevention maintenance of the tool; (c) selecting
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗