Layout method
Abstract
The location of one of a series of construction points at an indoor construction site is established using a robotic total station and a handheld device. Construction data is inputted into the handheld device with the construction data defining a plurality of construction points at the construction site. One of the plurality of construction points is selected with the handheld device. Data regarding the selected construction point is then transmitted wirelessly from the handheld device to a robotic total station. The robotic total station generates a beam of laser light, and directs the beam of laser light from the robotic total station to the construction point. The construction point is defined by x and y coordinates, and by an assumed z coordinate. The actual z coordinate is that of a point on a horizontal surface, such as a ceiling or floor, having the same x and y coordinates. Through an iterative process, the location of the construction point is established.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 15.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of establishing the location of one of a series of construction points at an indoor construction site, where the point is defined by x and y coordinates and an anticipated z coordinate on a generally horizontal building surface, with the construction point being established on an actual building surface by illumination of a point on said actual building surface that has said x and y coordinates, comprising the steps of: inputting construction data into a handheld device, said construction data defining a plurality of construction points at the construction site, selecting one of said
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 15 total)
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- Feldman, William et al., Work Management Software for the Field, Contractormag.com, Jul. 1, 2008.