Patents
US 8,027,795 B2#14134671 Most CitedActiveUnited States (USPTO)Utility

Load model generation for estimating a load value from a base load value in a system

7Forward Citations (#14134671 Global)
0.5/yrCitation Velocity (#17468043 Global)
4.23Citation PageRank (#4349823 Global)
6Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and system for establishing a load model ( 120 ) that utilizes a measurement from a second monitor ( 140 ) to estimate a value taken by a first monitor ( 150 ). A base load value associated with a load ( 160 ) is collected. The load model ( 120 ) is applied to the base load value, yielding an estimated load value. The estimated load value is representative of at least one measured load value for the load ( 160 ).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 7.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system comprising: a processor; a permanent monitor operably coupled to a load connected to an energy distribution system, wherein the permanent monitor produces base load values indicative of an energy-related parameter associated with the load and transmits the base load values to the processor, the base load values being collected over a period of time sufficient to capture an operational range of the load; a temporary monitor operably coupled to the load, wherein the temporary monitor produces, at substantially the same time as the permanent monitor, temporary load values indicative of t

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (1)

  • Lunneberg, Thomas A. et al., "Improving Simulation Accuracy Through the Use of Short-Term Electrical End-Use Monitoring".