Runway for aircraft and roadway for vehicles and method of renewing a runway or roadway
Abstract
The cover layer is applied as an asphalt cover layer ( 5, 5′, 5 ″) to avoid significant restrictions of the running traffic and for shortening the construction time. Also, this asphalt cover layer is arranged above the upper face (OK) of the runway or roadway in need of renewal and an asphalt base coarse layer ( 4, 4′, 4″, 4′″, 4″″, 4 ′″″) is disposed between the base layer ( 2, 2 ′) and the asphalt cover layer ( 5, 5′, 5 ″). A method subdivides the roadway or runway in the direction of travel into a primary lane ( 7 ) and at least one secondary lane ( 8, 9 ). First, the work subzones ( 10 ) to ( 14 ) of the primary lane ( 7 ) are processed and then the work effort is transferred to subzones ( 15 ) to ( 20 ) of the secondary lanes ( 8, 9 ) for processing. At least the frost-protective layer ( 1 ) remains in the earth and at least an asphalt base layer ( 4, 4′, 4″, 4′″, 4″″, 4 ′″″) and an asphalt cover layer ( 5, 5′, 5 ″) are applied thereon. The asphalt base layer ( 4, 4 ′) is applied to the level of the upper face (OK) for the old way and the asphalt cover layer ( 5, 5′, 5 ″) is applied above the level of the upper face (OK) of the old way.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for renewing a roadway for motor vehicles and a runway for aircraft, the way having an upper face (OK) before the renewal thereof and including a frost-protective layer, a base coarse layer and a cover layer, the method comprising the steps of: demolishing and renewing one or more of said layer(s) no longer needed while leaving at least said frost-protective-layer in the earth; applying at least one asphalt base layer onto said frost-protective layer and bringing said asphalt base layer up to the level of said upper face (OK); measuring a load bearing capacity of said asphalt base lay
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (35)
Non-Patent Literature (5)
- "Medienmitteilung: Autobahn A2 zwischen Erstfeld und Amsteg wird komplett erneuert", Uri Baut, Kanton Uri, XP-002486276, No. 1/2005, pp. 1 to 6.
- "Sanierung der Start- und Landebahn Süd am Flughafen Frankfurt", tis Jul.-Aug. 2006, XP-002486277, pp. 36 and 37.
- Blessmann, W. et al, "Überbauung einer Betondecke mit standfestem Asphalt für eine zeitlich begrenzte Nutzung", Bitumen Feb. 1994, pp. 61 to 65.
- Holl, A., "Stichwort: Strabetaenbau (bit)", Bauverlag GmbH, Wiesbaden, Berlin 1977, pp. 10 to 19.
- Holl, A., "Stichwort: Straβenbau (bit)", Bauverlag GmbH, Wiesbaden, Berlin 1977, pp. 10 to 19.