Power plant and operating method
Abstract
A method for operating a power plant ( 2 ), which includes at least one compressor ( 3 ), at least one turbine ( 4 ), and a burner arrangement ( 5 ), involves, to enhance the power plant ( 2 ), feeding a combustion exhaust gas from a pre-burner ( 8 ) of the burner arrangement ( 5 ) to an oxygen-removal device ( 11 ), which removes gas of the oxygen from the combustion exhaust gas in which it is contained.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for operating a power plant, which power plant includes at least one compressor, at least one turbine, and at least one burner arrangement including at least one pre-burner and at least one afterburner, the method comprising: compressing an oxidizer gas containing oxygen gas in the compressor; burning the compressed oxidizer gas under lean conditions and with a fuel gas in at least one pre-burner of the burner arrangement; feeding a combustion exhaust gas from the pre-burner to an oxygen-removal device which removes part of the oxygen gas from the combustion exhaust gas in which said
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- Search Report for German Patent App. No. 10 2004 047 807.4 (Sep. 22, 2005).