Validating a baseline of a project

15Forward Citations (#6456330 Global)
1.0/yrCitation Velocity (#6488121 Global)
2.11Citation PageRank (#13354968 Global)
29Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A computer-implemented method and system for validating a baseline of a project. A computing application executes routines to automatically identify baseline errors associated with one or more tasks and generate exception reports to facilitate correction of the errors. The baseline errors are identified via determinations of whether (1) a task has no resources assigned, (2) resources are assigned to a summary task, (3) a task has an invalid earned value method value, (4) a task or milestone was not baselined, (5) a task's baseline start date was manually updated, (6) a task's baseline finish date was manually updated, (7) a task's baseline cost (BAC) was manually increased, (8) a task's BAC was manually decreased, and (9) a task's budgeted cost of work performed is not equal to the task's BAC.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 15.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of validating a baseline of a project, said method comprising: a computer determining BCWS-BAC, wherein BCWS is a budgeted cost of work scheduled of said project and BAC is a baseline cost of said project; said computer determining BCWS-BAC is less than zero or BCWS-BAC is greater than zero; based on said determining BCWS-BAC is less than zero or BCWS-BAC is greater than zero, said computer determining said baseline cost is manually adjusted; based on said determining said baseline cost is manually adjusted by said determining BCWS-BAC is less than zero or BCWS-BAC is greater than zer

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • A high-performance, portable implementation of the MPI message passing interface standard psu.edu [PDF]W Gropp, E Lusk, N Doss, A Skjellum-Parallel Computing, 1996-Elsevier.
  • A high-performance, portable implementation of the MPI message passing interface standard psu.edu [PDF]W Gropp, E Lusk, N Doss, A Skjellum—Parallel Computing, 1996—Elsevier.
  • Active database rules with transaction-conscious stable-model . . . by C Zaniolo-1995-Cited by 59-Related articles.
  • Active database rules with transaction-conscious stable-model . . . by C Zaniolo—1995—Cited by 59—Related articles.
  • Active database systems psu.edu [PDF]U Dayal, E Hanson, J Widom-Modem Database Systems, 1995-Citeseer.