Tilt-lift method for erecting a bridge
Abstract
One bridge pier, two bridge girders and two supporting rods are manufactured in an approximately vertical position. The supporting rods are connected to the top of the pier and to the bridge girders. The bridge girders are brought into the horizontal final position by raising the end points of the bridge girders, which end points are located beside the pier. Finally, the end points ( 9 ) of the bridge girders are connected to the pier.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A process for the manufacture of a bridge, comprising: erecting a pier, at least one bridge girder with end points and at least one supporting rod with end points in an approximately vertical position; hinging one end point of the supporting rod to the bridge girder; performing at least one of: hinging another end point of the supporting rod to the pier, the bridge girder being brought into an approximately horizontal position by an approximately vertical motion of one end point of the bridge girder on the pier, said one end point of the bridge girder being connected to the pier; and hinging a
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (21)
Non-Patent Literature (1)
- Beton im Form, "Bogenbrücke in Neuartigem Klappverfahren", Offizielles Organ des Bundesverbandes der Deutschen Zementindustrie e. V.; Mai 1984, p. 200, Heft 5, 34. Jahrgang.