Construction payment management system and method with graphical user interface features
Abstract
A system and method for managing a construction payment process. One graphical user interface embodying the invention can include a project schedule progress bar and a funds disbursed progress bar. The project schedule progress bar indicates progress with respect to calendar dates of a construction project, and the funds disbursed progress bar indicates progress with respect to a budget dollar amount of a construction project. Another graphical user embodying the invention can include an organization form, a project form, a budget form, a draw initiated notification, an enter request for payment form, a sign lien waiver notification, and a payment disbursed notification for notifying the plurality of participants that a payment has been disbursed for the pending draw to each of the plurality of participants based on the payment information received from each of the plurality of participants.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A construction payment management system comprising a processor and a memory storing instruction that, when executed by the processor, cause the system to: receive participant information including payment information from one of a plurality of participants associated with a construction project through an organization form displayed on a graphical user interface; display a draw initiated notification for notifying the one of the plurality of participants of a pending draw for the construction project, wherein the draw initiated notification is displayed according to notification preference in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2014100890 A1 | Risk management system and method for protecting virtual assets | — | 2 |
| US 8,738,519 B2 | Waiver decisioning | 2014 | 4 |
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "Conditional Waiver and Release of Lien Upon Progress Payment"; htt://www.contractorform.net/contractor-forms-Conditional-Waiver-and-Release-of-Lien; Excel 1997-2003; pp. 1-3.
- Computerease, Inc.; "Paragon, Software for Contractors;" p. 1.
- Construction Monitoring Systems, LLC; "About AD Logo;" Welcome to AccuDraw [online]; [retrieved on Jun. 9, 2004]; Retrieved from the Internet ; p. 1.
- Construction Monitoring Systems, LLC; "About AD Logo;" Welcome to AccuDraw [online]; [retrieved on Jun. 9, 2004]; Retrieved from the Internet <URL: http://accudraw.com/aboutAccuDraw.asp?UPK=&IoD=&LoT=&EID=&SID=>; p. 1.
- Construction Monitoring Systems, LLC; "AccuDraw, An AD network product;" Builder Page [online]; [retrieved Jun. 9, 2004]; Retrieved from the Internet ; pp. 1-3.