Turbine starting controller and turbine starting control method
Abstract
A turbine starting controller includes: an optimum starting control unit for predicting, while taking as a variable a turbine acceleration rate/load increase rate as a directly manipulated variable, thermal stress generated in a turbine rotor over a prediction period from a current time to the future, calculating for each control cycle a manipulated variable optimum transition pattern in the prediction period which makes a turbine starting time shortest while keeping the predicted thermal stress equal to or lower than a prescribed value, and determining as an actual optimum manipulated value a value at the current time in the manipulated variable optimum transition pattern; and an rpm/load control unit to which the optimum manipulated variable from the optimum starting control unit is input, for controlling the drive of control valves.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A turbine starting controller for adjusting and controlling an amount of steam or gas flowing into a turbine using a control valve, comprising: an optimum starting controlling unit configured to: predict a heat transfer rate in a prediction period based on a directly manipulated variable, predict a rate of change of a first stage metal temperature in the prediction period based on the predicted heat transfer rate and a measured first stage metal temperature at a current time, predict thermal stress generated in a turbine rotor over the prediction period from a current time to a future, calcula
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗