User equipment, base station apparatus, and method
Abstract
User equipment that is capable of transmitting at least an uplink control channel to a base station apparatus using a single carrier method and to which persistent scheduling is applied, the user equipment includes a unit providing data arrival acknowledgement information, a unit providing channel quality information, a control channel generation unit generating an uplink control channel including at least one of the data arrival acknowledgement information or the channel quality information, and a transmission unit transmitting the uplink control channel using a predetermined dedicated bandwidth, in which the uplink control channel includes at least one unit block including a sequence in which a same factor reported using an upper-layer signaling is multiplied to each chip of an orthogonal code sequence for the user equipment.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 20.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A user equipment terminal transmitting at least an uplink control channel to a base station apparatus using a single carrier method, the user equipment terminal employing persistent scheduling in which a predetermined resource is periodically allocated in advance, the user equipment terminal comprising: a determination unit that provides data arrival acknowledgement information indicating an acknowledgement response or a negative acknowledgement response as a response to a downlink data channel; an estimation unit that provides channel quality information indicating downlink channel quality; a
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 20 total)
References Cited — Backward Prior Art (7)
Non-Patent Literature (5)
- 3GPP TSG RAn WG1 Ltd Ad Hoc; R1-061675; "Data-non-associated L1/L2 Control Channel Structure for E-UTRA Uplink"; Cannes, France; Jun. 27-30, 2006 (6 pages).
- 3GPP TSG RAN WG1 Meeting #46bis; R1-062742; "CDM-Based Multiplexing Method of Multiple ACK/NACK and CQI for E-UTRA Uplink"; NTT DoCoMo, Ericsson, Fujitsu Mitsubishi Electric, Sharp, Toshiba Corporation; Seoul, Korea; Oct. 9-13, 2006 (6 pages).
- 3GPP TSG RAN WG1 Meeting #47; R1-063319; "Persistent Scheduling in E-UTRA"; NTT DoCoMo, Inc., NEC; Riga, Latvia; Nov. 6-10, 2006; (5 pages).
- 3GPP TSG RAN WG1 Meeting #47; R1-063354; "CDMA Based Multiplexing of ACK/NACK and CQI Control Information in E-UTRA Uplink"; KDDI, NTT DoCoMo; Nov. 6-10, 2006 (4 pages).
- International Search Report w/translation from PCT/JP2007/074965 dated Feb. 5, 2008 (4 pages).